Two-stage Burner With Precise Adjustment And Stable Operation And High Efficiency
Product Details:
Place of Origin: | Italy |
Brand Name: | baltur |
Certification: | CE、EAC、SGS |
Model Number: | TBL |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | US $999.00 |
Packaging Details: | Bulk, packaged |
Delivery Time: | 10-30working days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 100set |
Detail Information |
|||
Product Name: | Two Stage Burner | Mode Of Operation: | Two-stage Fire |
---|---|---|---|
Power: | 16.6-56.3KW | Pipe Position: | Upward |
Highlight: | Two-stage burner,Precise Adjustment Two-stage burner,Stable Operation Two-stage burner |
Product Description
Product introduction:
Two-stage burner
The working mode of the burner is low fire-high fire, that is, the burner has two working points, that is, it can work in one stage (low fire) or in two stages (high fire). There are two devices Tc and T2 (thermostat or pressure switch) on the burner control circuit to control the operating state of the burner. The setting value of T2 is lower than the setting value of Tc. After the burner is started, if the temperature (or pressure) of the heated object is lower than the setting value of Tc and T2, Tc and T2 are both closed, and the burner operates in two stages (high fire); if the temperature (or pressure) of the heated object is lower than Tc but higher than the setting value of T2, TC is closed, T2 is disconnected, and the burner operates in one stage (low fire); if the temperature (or pressure) of the heated object is higher than the setting value of Tc, T2 and Tc are both disconnected, and the burner is controlled to shut down; when the temperature (or pressure) of the heated object drops below the setting value of TC, Tc is closed again, and the burner automatically restarts and operates as described above.
Technical and performance characteristics:
1. Two-stage operation (high/low fire)
2. Adaptable to any type of combustion chamber.
3. The mixing unit can be directly removed without removing the burner from the boiler, which is convenient for maintenance
4. The first and second stage air flow are adjusted by servo motor; when the burner is paused, the damper is closed to reduce heat loss in the furnace
5. The combustion air inlet with flow adjustment device automatically closes the air damper.
argument:
Model | TBL 85P TBL 85P DACA |
TBL 105P TBL 105P DACA |
TBL 130P TBL 130P DACA |
TBL 160P TBL 160P DACA |
TBL 210P DACA | |
Thermal power most kW Minimum kW |
850 | 1,050 | 1,300 | 1,600 | 2,100 | |
200 | 320 | 400 | 500 | 800 | ||
Operation mode | Two -stage fire | |||||
NOx emission mg/kWh | < 185 (Classe II EN 267) | |||||
Motor kW r.p.m. |
1.1 | 1.5 | 2.2 | 2.2 | 3 | |
2,800 | 2,800 | 2,800 | 2,800 | 2,800 | ||
* Consumption power kW | 1.50 | 1.90 | 2.60 | 2.60 | 3.40 | |
safety | A 400 V | 6 | 6 | 10 | 10 | 16 |
Ignition transformer | 2 x 5 kV - 30 mA - 230 V/ 50 Hz | |||||
Voltage | 3N ~ 400 V ±10%- 50Hz | |||||
Protection level | IP 40 | |||||
Flame detection | Photoresistance | |||||
** noise dBA | 73 | 75.5 | 79 | 79 | 87 | |
Weight kg | 82 | 88 | 92 | 92 | 95 | |
Maximum fuel viscosity (light oil) | 5.5 cst/20°C - 1.5° E / 20°C | |||||
Flow rate most kg/h Minimum kg/h |
71.6 | 88.5 | 109.6 | 134.9 | 177 | |
16.9 | 27 | 33.7 | 42.2 | 67.4 |
FAQ
Q1: How can you get the best price quickly?
1.We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.
2. Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.
Q2:Why choose us?
1.40+ years of boiler manufacturing experience, 10 years of export experience.A grade boiler factory.
2.Free replacement of parts for one year, lifetime maintenance of the main engine, except for improper operation.
Q3: Details of electric control cabinet
Electric control cabinet adopts PLC touch screen, display in English. It shows working condition details of boiler, such as water temperature, water pressure, exhaust gas temperature, and over-pressure alarm, etc. In addition, the cabinet is used for set up the parameter, record and analyze the operation data, etc.
Q4:What is the using life of your boiler?
1.Normally the boiler is designed for 20 years life span, but with right operation and good maintenance,the boiler can be used for 20-25 years.