Fire Tube 1.6mpa Pellet Steam Boiler Easy Operation
Product Details:
Place of Origin: | Henan, China |
Brand Name: | TAIGUO |
Certification: | CE、EAC、SGS |
Model Number: | DZL |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | USD$10000.00 |
Packaging Details: | Bulk, packaged |
Delivery Time: | 25 working days |
Payment Terms: | L/C, T/T, D/P, D/P |
Supply Ability: | 10set |
Detail Information |
|||
Product Type: | Industrial Steam | Industrial Steam: | 1t/h-10t/h |
---|---|---|---|
Working Pressure: | 1.0、1.25、1.6Mpa | Fuel: | Biomass |
Rated Feed Water Temperature: | 20℃ | Warranty: | 1 Year |
Condition: | New | Weight: | Regarding The Boiler Required |
Boiler Structure: | Fire Tube | Type: | Chain Grate |
Style: | Horizontal | Capacity: | Steam Boiler |
Design Efficiency: | 83-91% | Design Fuel Consumption: | 190Kg/h |
Design Pressure: | 1.25Mpa | Design Temperature: | 204℃ |
Efficiency: | 80-90% | Emission: | ≤30mg/m³ |
Exhaust Temperature: | ≤160℃ | Fuel Consumption: | 170-220Kg/h |
Pressure: | 0.7-2.5Mpa | Temperature: | 184-350℃ |
Thermal Efficiency: | ≥90% | ||
Highlight: | 1.6mpa pellet steam boiler,fire tube pellet steam boiler,1.6mpa chain grate biomass steam boiler |
Product Description
Product introduction:
The biomass boiler of TAIGUO uses a scales -type chain stove, which has a wide range of fuel applicability. It has mechanized feed, uniform feed, control the speed of fuel combustion, should not be recovered, and the mechanical gray is convenient. In addition, due to the continuous tilt and loosening of the fuel layer, the contact between air and fuel has greatly enhanced and the combustion strength is high. At the same time, it saves manpower and reduces the labor intensity of boiler workers.
Technical parameter:
item |
DZL1 |
DZL2 |
DZL3 |
DZL4 |
DZL6 |
DZL8 |
DZL10 |
DZL12 |
DZL15 | ||
Rated evaporation capacity(t/h) | 1 | 2 | 3 | 4 | 6 | 8 | 10 | 12 | 15 | ||
Rated pressure(Mpa ) | 0 .7/ 1 .0/ 1 .25 | 0 .7/ 1 .0/ 1 .25 | 0 .7/ 1 .0/ 1 .25 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | ||
Rated steam temperat ure( ℃ ) | 170/ 184/ 194 | 170/ 184/ 194 | 170/ 184 / 194 | 194/204 | 194/204 | 194/204 | 190/204 | 194/204 | 194/204 | ||
Feed water temperat ure( ℃ ) | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | ||
Heating Area( m) | Body | ~33 | ~50 | ~75 | ~100 | ~170 | ~200 | ~250 | ~340 | ~415 | |
Economizer | 20 .7 | 25 .3 | 28 .6 | 33 . 12 | 87 .2 | 98 | 145 | 168 | 189 | ||
Effective area of garte ( m) | 2 .22 | 4 . 1 | 5 .85 | 6.2 | 7 .95 | 9 .75 | 10 .77 | 13 .4 | 16 .6 | ||
Fuel type | Biomass pellet,wood sawdust,bamboo chip,wood block,straw ,Jute, palm shell | ||||||||||
Fuel Consumption (kg/h) | ~200 | ~400 | ~600 | ~800 | ~1000 | ~1200 | ~1400 | ~1600 | ~1800 | ||
Flue gas temperat ure( ℃ ) | ~150 | ~150 | ~150 | ~150 | ~150 | ~150 | ~150 | ~150 | ~150 | ||
T hemal efficiency(%) | ~82 | ~82 | ~82 | ~82 | ~82 | ~82 | ~82 | ~82 | ~82 | ||
Weight of biggest part for t ransportation(t) | 17 | 18 .5 | 20 | 25 | 35 | 45 | 58 | 64 | 77 | ||
Overall dimension of biggest part for t ransportation( m) | 5 . 1*2 .2 *3 | 5 .5*2 .3 *3 .3 | 6 .4*2 . 4*3 .5 | 6 .6*2 .6 *3 .6 | 8 . 1*2 .9 *3 .8 | 8 .3*3 . 1 *4 .0 | 8 .6*3 .2 *4 .2 | 9 .8*4 .2 *4 .5 | 12 .9*4 *7 .5 |
Work flow chart:
After-sales service:
1. Our service tenet is "to provide customers with sincere, quality service". We are committed to honesty and good service to our customers and are committed to continuously improving the quality of service and increasing user satisfaction.
2. Provide technical advice to users, including the use and maintenance of products
Assembly, use characteristics and other technical problems, where the user needs to provide services,
The company will send the best engineering and technical personnel for customer service and technical consultation.
3. When users use our products for quality problems, they will reply within 1 hour when receiving customer service needs, and provide solutions within 24 hours.
4. Implement the "Product quality responsible person system". After the contract is signed, from product manufacturing, warehousing, delivery to installation, trial operation, the whole process of service, improve the quality of the project.