Compact Structure Biomass Fired Steam Boiler Small Footprint
Product Details:
Place of Origin: | Henan, China |
Brand Name: | TAIGUO |
Certification: | CE、EAC、SGS |
Model Number: | DZL |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | US $10000.00 |
Packaging Details: | Bulk, packaged |
Delivery Time: | 30 working days |
Payment Terms: | L/C, T/T |
Supply Ability: | 100set |
Detail Information |
|||
Product Type: | Industrial Steam | Industrial Steam: | 1t/h-10t/h |
---|---|---|---|
Working Pressure: | 1.0、1.25、1.6Mpa | Fuel: | Coal, Biomass Particles, Wood Chips, Palm Shells, Etc |
Rated Feed Water Temperature: | 20℃ | ||
Highlight: | compact structure biomass fired steam boiler,small footprint biomass fired steam boiler,compact chain grate biomass steam boiler |
Product Description
Product introduction:
The DZL10-1.25-T boiler is a single-barrel longitudinal type water fire tube shell type steam boiler, the combustion equipment is a chain grate, the left and right sides of the furnace are equipped with fin film type water cooling wall, the inside and outside of the furnace are tubular convection heating surface, and the threaded smoke pipe convection heating surface is arranged in the pot drum.
The chain grate implements mechanical coal feeding, equipped with blower and induced draft fan to achieve mechanical ventilation, and equipped with scraper slag machine to achieve mechanical slag.
Product characteristics:
1.Compact structure, compared with the same type of boiler, small size, save the boiler room infrastructure investment.
2. Stable operation, convenient adjustment, sufficient output.
3. The threaded smoke pipe is used to strengthen heat transfer, improve the heat transfer coefficient and thermal efficiency, because the flue gas has a disturbance in the pipe. The smoke pipe is not easy to accumulate ash, and plays the role of self-cleaning.
Technical parameter:
item |
DZL1 |
DZL2 |
DZL3 |
DZL4 |
DZL6 |
DZL8 |
DZL10 |
DZL12 |
DZL15 | ||
Rated evaporation capacity(t/h) | 1 | 2 | 3 | 4 | 6 | 8 | 10 | 12 | 15 | ||
Rated pressure(Mpa ) | 0 .7/ 1 .0/ 1 .25 | 0 .7/ 1 .0/ 1 .25 | 0 .7/ 1 .0/ 1 .25 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | 1 .25/ 1 .6 | ||
Rated steam temperat ure( ℃ ) | 170/ 184/ 194 | 170/ 184/ 194 | 170/ 184 / 194 | 194/204 | 194/204 | 194/204 | 190/204 | 194/204 | 194/204 | ||
Feed water temperat ure( ℃ ) | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | ||
Heating Area( m) | Body | ~33 | ~50 | ~75 | ~100 | ~170 | ~200 | ~250 | ~340 | ~415 | |
Economizer | 20 .7 | 25 .3 | 28 .6 | 33 . 12 | 87 .2 | 98 | 145 | 168 | 189 | ||
Effective area of garte ( m) | 2 .22 | 4 . 1 | 5 .85 | 6.2 | 7 .95 | 9 .75 | 10 .77 | 13 .4 | 16 .6 | ||
Fuel type | Biomass pellet,wood sawdust,bamboo chip,wood block,straw ,Jute, palm shell | ||||||||||
Fuel Consumption (kg/h) | ~200 | ~400 | ~600 | ~800 | ~1000 | ~1200 | ~1400 | ~1600 | ~1800 | ||
Flue gas temperat ure( ℃ ) | ~150 | ~150 | ~150 | ~150 | ~150 | ~150 | ~150 | ~150 | ~150 | ||
T hemal efficiency(%) | ~82 | ~82 | ~82 | ~82 | ~82 | ~82 | ~82 | ~82 | ~82 | ||
Weight of biggest part for t ransportation(t) | 17 | 18 .5 | 20 | 25 | 35 | 45 | 58 | 64 | 77 | ||
Overall dimension of biggest part for t ransportation( m) | 5 . 1*2 .2 *3 | 5 .5*2 .3 *3 .3 | 6 .4*2 . 4*3 .5 | 6 .6*2 .6 *3 .6 | 8 . 1*2 .9 *3 .8 | 8 .3*3 . 1 *4 .0 | 8 .6*3 .2 *4 .2 | 9 .8*4 .2 *4 .5 | 12 .9*4 *7 .5 |
Work flow chart:
After-sales service:
1. Our service tenet is "to provide customers with sincere, quality service". We are committed to honesty and good service to our customers and are committed to continuously improving the quality of service and increasing user satisfaction.
2. Provide technical advice to users, including the use and maintenance of products
Assembly, use characteristics and other technical problems, where the user needs to provide services,
The company will send the best engineering and technical personnel for customer service and technical consultation.
3. When users use our products for quality problems, they will reply within 1 hour when receiving customer service needs, and provide solutions within 24 hours.
4. Implement the "Product quality responsible person system". After the contract is signed, from product manufacturing, warehousing, delivery to installation, trial operation, the whole process of service, improve the quality of the project.