Biomass hand fired hot blast stove pure air mixed air stable operation
Product Details:
Place of Origin: | Henan, China |
Brand Name: | TAIGUO |
Certification: | CE、EAC、SGS |
Model Number: | LRF |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | US $7000.00 |
Packaging Details: | Bulk, packaged |
Delivery Time: | 30 working days |
Payment Terms: | L/C, T/T |
Supply Ability: | 100set |
Detail Information |
|||
Product Name: | Biomass Hand Fired Hot Blast Stove | Thermal Efficiency: | 70-75% |
---|---|---|---|
Heating Capacity: | 0.12-1.4MW | Fuel: | Coal Or Biomass |
Highlight: | Stable Operation Biomass hot blast stove,Pure Air Biomass hot blast stove,Mixed Air Biomass hot blast stove |
Product Description
Product introduction:
The feeding part of LRF series hot blast furnace adopts the dragon to independently feed and the auxiliary blower to assist the feeding. The material is spread out into the furnace to lay evenly through the feeding blast, which makes the fuel burn more fully and avoids the danger of tempering. The air volume of the hot blast furnace blows the normal temperature air into the furnace through the high-pressure fan. The heat exchanger passes through the furnace burning flame and flue gas at the first and second layers to exchange heat, so that the air temperature reaches the pure air temperature used by the user.
Product advantage:
This product adopts multi-head spiral groove heat exchange and indirect heat transfer technology, the combustion and heat transfer design into an integrated, so that the product has the characteristics of compact structure, small footprint, easy installation and operation, large heat exchange intensity, fast heating, clean hot air, high thermal efficiency, stable performance and so on.
The combustion chamber and heat exchanger of the hot blast furnace are integrated into one, and the multi-layer sleeve structure of the whole steel plate is adopted. The lower part of the furnace core is the combustion chamber, the upper part and the surrounding part are the circular heat exchanger, and the air and flue gas are double return, and each carries out heat exchange in its own way.
Technical parameter:
Name | LRF-10 | LRF-20 | LRF-30 | LRF-40 | LRF-60 | LRF-80 | LRF-100 | LRF-120 |
Thermal Efficiency(%) | 70 | 70 | 70 | 70 | 75 | 75 | 75 | 75 |
Hot Air Outlet Temperature(℃) | 200-300 | 200-300 | 200-300 | 200-300 | 200-300 | 200-300 | 200-300 | 200-300 |
Heating Supplied(MW) | 0.12 | 0.24 | 0.35 | 0.47 | 0.7 | 0.93 | 1.17 | 1.4 |
Air Volume(Nm/h) | 3297-2198 | 3847-3572 | 5447-3912 | 6445-7513 | 6786-7532 | 7813-8685 | 8867-9984 | 10556-12370 |
Coal Consumption(Kg/h) | 27 | 54 | 85 | 108 | 162 | 211 | 260 | 320 |
Power Consumption(KW) | 7.2 | 9 | 11 | 22 | 24 | 24 | 30 | 37 |
Design Fuel | Coal or Biomass | |||||||
Overall Diameter(mm) Dimension Height(mm) |
1220 | 1500 | 1750 | 1840 | 1850 | 2100 | 2340 | 2500 |
2450 | 2740 | 3500 | 3790 | 4350 | 6395 | 6400 | 6800 | |
Weight Reference(t) | 1.3 | 1.6 | 2.3 | 3.8 | 4.2 | 5.2 | 6.4 | 8 |
Q1: How can you get the best price quickly?
1.We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.
2. Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.
Q2:Why choose us?
1.40+ years of boiler manufacturing experience, 10 years of export experience.A grade boiler factory.
2.Free replacement of parts for one year, lifetime maintenance of the main engine, except for improper operation.
Q3: Details of electric control cabinet
Electric control cabinet adopts PLC touch screen, display in English. It shows working condition details of boiler, such as water temperature, water pressure, exhaust gas temperature, and over-pressure alarm, etc. In addition, the cabinet is used for set up the parameter, record and analyze the operation data, etc.
Q4:What is the using life of your boiler?
1.Normally the boiler is designed for 20 years life span, but with right operation and good maintenance,the boiler can be used for 20-25 years.